- After
-

- Preliminary 3D Model
-

- Construction
-

- Before
|
- OWNER
- Umatilla Electric Cooperative
-
- COMPLETED
- Fall 2000
-
- COST
- N/A
-
- SIZE
- -
-
- PROJECT SCOPE
- The project consisted of a facade
upgrade. Our client desired a building more modern in appearance that would convey an
advanced technology, in keeping with the sales of satellite dishes. The metal fascia,
stucco and split-faced CMU walls help convey that image and were selected for their
longevity.
-
- ARCHITECTURAL SERVICES
- Architectural services included
project design, preliminary cost estimate, preparation of construction drawings, bidding
phase administration, and construction phase site observations and project administration.
|